
Quick links to other important
Muon and Trigger documents:
Technical Proposal: ATLAS
High-Level Triggers, DAQ and DCS, 11 April 2000,
TDRs:
MUON,
Level-1
Status reports:Trigger
Performance,
DAQ,
EF, LVL2 and DCS
Front-End
Electronics Co-ordination
Racks
& Crates in ATLAS
TTC
web page
Design pages in Japan:
TGC
Electronics,
Hasuko's
TGC Electronics pages,
Osamu's
design,
PSPACK
details
Muon
Spectrometer Alignment Page
Error messages from Acrobat Reader?
Presentations at
TGC Workshops and other meetings
TGC documents --collected
for the On-chamber Electronics PDR, June 2000
Revised Muon Endcap
chapter of the Level-1 Trigger TDR, Rev 01, 9 June 2000
Related documents
Other TGC documents
TGC parameter book (last update 17 Oct
00):
Excel binary file (Zipped),
PostScript
(Zipped) and Pdf.
TGC description in
amdb_simrec
format
Detailed breakdown of
wire
ganging
Physicist's drawings
(Paw macro to produce them)
Overall views
TGC Trigger (T.M) and 2nd-coordinates (T.I) planes
MDT:
Support structures and cable routing (engineering
drawings, May 2000)
Wheel 1/2/3 inner
Endcap and Forward sets
Detector Contours (engineering drawings, as of
October 2000)
In Autodesk-3D format:
Index
In Pdf format: (M2-H means M2 station with
Hole, etc...)
| T01 | T02 | T03 | T04 | T05 | T06 | T07 | T08 | T09 | T10 | T11 | |
| Triplets | M1, M1-H | M1 | M1, M1-H | M1 | M1 | ||||||
| Doublets | M2, M2-H, M3, M3-H | M2-M3 | M2-M3 | M2-M3, M2-H, M3-H | M2-M3 | M2-M3 | M2-M3 |
Alignment Holes (engineering drawings, as
of October 2000)
Drawings (in PDF format) :
High
Eta,
Medium
Eta
View of two beams accross all stations:
jpeg,
pdf
TGC Construction Manual:
Main
manual and
Supplier's Data Sheets (PDF)
Construction Schedule:
MS-Project
file ((zipped),
PDF
and
PostScript.
TGC Flammable Gas Safety Report:
PDF
and
PostScript.
Production database software:
Parts list
Wire Pads for chambers
| Type | T07 | T08 |
| Update | 28 Apr 00 | 23 Mar 00 |
| A4 multipage | ps,pdf, | ps,pdf |
| A2 one-page | eps,pdf, | eps,pdf |
Details of wire pads
Automatic Update:
Production
summary
Manual Update (last 11 Dec 2000):
History of Detectors
and
Units production
Summary of important Quality
Control measurements
Complete repository
(not yet organised)
Pictures of the Weizmann Production Lab
Warehouse:
1,
2,
3
Honeycomb and Fiberglass Frames:
1,
2,
3,
4,
5,
6,
7,
8,
Graphite Masking, Spraying & Resistivity
checking:
1,
2,
3,
4,
5,
6
Half detectors gluing:
1,
2,
3,
4,
5,
6,
7,
8,
9
Winding process:
1,
2,
3,
4,
5,
6,
7,
8,
9,
10,
11,
12,
13,
14
Detector closure in clean room
1,
2,
3,
4,
5
Unit Gluing and assembly:
1,
2,
3,
4,
5,
6,
7,
8
Details of electronic components and boards,
Gas inlets, Kinematic supports :
1,
2,
3,
4,
5,
6,
7,
8,
9,
10,
11,
12,
13
HV pulse tests:
1,
2,
3,
4,
5,
6,
7,
8,
9,
10
Detectors and Units storage & transportation:
1,
2,
3,
4,
5
Data Base:
1,
2
Pictures of the Weizmann Test Lab1,
2,
3,
4,
5,
6
Pictures of the Technion Test Bench1,
2,
3,
4,
5,
6,
7,
8,
9,
10,
11,
12,
13,
14,
15,
16,
17
Wires under Electronic Microscope:
1,
2,
3
CERN 1998, X5, high radiation:
detailed
profiles,
HV curves,
Rate
dependence.
Time distribution for wires at
25
degrees
Top of page
Institute home page
Last update: 11 Dec 2000 by
Daniel
Lellouch